All buildings in Enclave One have been completely framed, all garage roofs are on, and pool excavation has begun, so you can really get a sense of scale at Luana Garden Villas. Siding, drywall, and sliding lanai doors have already been installed in Building 1. With over half the foundations poured, the homes in Enclave Two will “go vertical” in the coming weeks.